Skip to contentBuilds for maik
Status
- The last build was successful.
- The last build was successful. A new build is in progress.
- The last build was successful but unstable. This is primarily used to represent test failures.
- The last build was successful but unstable. A new build is in progress.
- The last build failed.
- The last build failed. A new build is in progress.
- The project has never been built.
- The first build is in progress.
- The last build was aborted.
- The last build was aborted. A new build is in progress.
- The project is disabled.
- The project is disabled, but a build is in progress.
Project Health
- Project health is over 80%
- Project health is over 60% and up to 80%
- Project health is over 40% and up to 60%
- Project health is over 20% and up to 40%
- Project health is 20% or less